Replacement of flare piping header, including installation of new condensate vessels and connection of all pressure relief valves of connected production units. Replacement of actual burner, molecular seal and flare stack anchor cables.
LPG Flare System
Year of Implementation
-
Sector
Chemical and Crude Oil Industry
Client
ČESKÁ RAFINÉRSKÁ, a.s., Litvínov, CZ
Scope
Basic Design, Design Documentation for Building Permit, Detail Design, As-built documentation, Design supervision, Delivery, Equipment Installation, Start-up